Bildegalleri
Nye - Practical Schedule Risk Analysis, Integrated Cost-Schedule Risk Analysis
Beskrivelse av varen
Disse bøkene er helt nye, uten markering.
1) Practical Schedule Risk Analysis
by David Hulett (Author) Hard cover
Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions.
The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong.
A schedule risk analysis explores the implications for the project's schedule of risk to the activity durations and also identifies the most important schedule risks.
This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level.
TILSTAND: Ny
Kjøpte den for 1800 NOK inkludert frakt fra USA.
Selges kun 500 NOK
Ny pris 400 NOK
Ny pris 350
2) Integrated Cost-Schedule Risk Analysis
by David Hulett (Author) Hard cover
Project managers tend to believe their cost estimates - whether they have exceeded budgets in the past or not. It is dangerous to accept the engineering cost estimates, which are often optimistic or unrealistic.
Though cost estimates incorporate contingency reserves below-the-line, these estimates of reserves often do not benefit from a rigorous assessment of risk to project costs. Risks to cost come from multiple sources including uncertain project duration, which is often ignored in cost risk analyses. In short, experience shows that cost estimating on projects is rarely successful - cost overruns routinely occur.
There are effective ways to estimate the impact on the cost of complex projects from project risks of all types, including traditional cost-type risks and the indirect but often substantial impact from risks usually thought of as affecting project schedules.
Integrated cost-schedule risk anlaysis helps us determine how likely the project will go over budget with the current plan, how much contingency reserve is required to achieve a desired level of certainty, and which risks are most important so the project manager can mitigate them and achieve a better result.
TILSTAND: Ny
Kjøpte den for 1300 NOK inkludert frakt fra USA.
Selges kun 500 NOK
Hentes ved Sandvika storsenter/Sandvika togstasjon.
Kan sendes ved porto så lenge kjøperen betaler for det.
Du må være logget inn for å se brukerprofiler og sende meldinger.
Logg innAnnonsens metadata
Sist endret: 7.11.2024, 04:25 ・ FINN-kode: 315651032
Mer fra selgeren
Vis alle (27)Mer som dette
800 kr
Betalt plassering